Residents of the New England, who have been participating for decades in campaigns to re-activate the Great Northern Railway (GNR) line for passenger services, are often derided by their opponents as living in the age of steam locomotives.
In 2026 two important events have dramatically enlivened and boosted New England Network’s campaign for a better future for the whole of New England, where the GNR line becomes the foundation for a much better quality of life:
- Closure of the Strait of Hormuz, due to the intense bloody war involving Iran, Israel and USA, has caused the price of diesel fuel for road freight to rise astronomically and extremely fast. It is already causing numerous smaller trucking firms to close down, because they are unable to pass the increased diesel charge onto their big business clients, under rigid contracts they have to honour.
- The Australian Government terminated Inland Rail beyond Parkes on 6-may-2026. That now creates an unexpected opportunity for the Australian Government to re-activate the long idle GNR line between Armidale and Wallangarra in QLD.

The Save the GNR campaign is driven by residents, ratepayers and business owners through the federal electorate of New England, not just the local government area of Armidale Regional Council.
Stakeholders who share an interest in historic, freight and passenger rail services being restored on the unused GNR line north of Armidale to Wallangara QLD, including:
- Elected local, NSW and Federal politicians committed clean energy and environment
- investors needing containerised rail freight in short – medium term, to justify significant investment in new businesses and jobs in New England, such as at Guyra
- local residents demanding better public transport
- rail engineering businesses who are potential partners in submitting an unsolicited PPP to Australian government for the GNR Freight Artery
- pro-rail campaign groups in New England
- pro-rail campaign groups in southern QLD
- rail advocacy groups like EcoTransit Regional
- financiers who want to invest in rail freight infrastructure which has a strong Return on Investment

The New England Network (NEN) itself is just one of many groups in the Save the GNR campaign team. They are united by their common Objective of wanting better economic outcomes for New England residents in the next 3 decades, for their children and future grandchildren.
Today the focus of the Save the GNR campaign is on stopping the Mayor and Councillors on Armidale Regional Council demolishing rail infrastructure in the GNR easement between Armidale and Ben Lomond, which is the first stage 1 of the New England Rail Trail (NERT)

Possible staging to create the GNR Freight Artery
OUR VISION, IN STAGES
- Stage 1: Repurpose the re-activated GNR line to become a vibrant, business and wealth generator for the whole of the New England region, with the branding of GNR Freight Artery.
- The GNR Freight Artery can begin moving small loads of container freight very quickly with minimal cost and time delay for the businesses now being created at Llangothlin Guyra by NEID and David Peter‘s organic food production facility.
- Once the GNR line is re-activated with Federal Govt support and finance then it will be a cheaper solution for the NSW Government to return passenger services from Sydney, through Armidale all the way to Tenterfield and Wallangarra, just across the QLD border.
- The GNR Freight Artery can begin moving small loads of container freight very quickly with minimal cost and time delay for the businesses now being created at Llangothlin Guyra by NEID and David Peter‘s organic food production facility.
- Stage 2: extend the GNR Freight Artery by making the existing line dual gauge from Wallangarra QLD to Toowoomba.
- Stage 3: Explore the possibility of a new section of dual gauge line from Wallangarra to Warwick, Beaudesert, Acacia Ridge and ultimately Brisbane. Standard gauge trains already run from Sydney right into the Brisbane CBD via the NSW Coast Line.
- Stage 4: Explore the same plan that Inland Rail had for building a new line from Gowrie (Toowoomba) to Port of Gladstone, via existing coal lines in central QLD, such as the Surat Basin Line.
- Stage 5: As was planned with Inland Rail in the longterm, build a new line between Toowoomba – Gladstone in standard gauge that utilizes the existing Surat Basin mining rail line. This considerably shortens the length of new line needed north of Toowoomba. It also avoids problems negotiating the steep gradients on the eastern side of the Darling Downs to reach the existing narrow gauge coastal line to Brisbane, or to reach Brisbane intermodal hubs and ports.
IGNORE THE “LOOK OVER HERE” DISTRACTIONS
- NERT‘s Cycling+Walking Trail can be built in the GNR corridor as an off-formation design, beside the GNR line, with a fence to separate people and trains. This has been done many times already at Oberon and sections of Parramatta Light Rail L4 near Carlingford, to name just 2.
- Many Cycling Trails are also built beside busy main highways with just a light separation between cars, trucks and cyclists


Fig 4. Examples of off-formation cycling trails beside rail line & main road.
The Campaign Team
savetheGNR@gmail.com
11-nov-2026